Key takeaways
- Call 811 before any digging.
- Structures, walls and electrical often need permits.
- HOAs may require drawings and approval.
- Your contractor should help with all three.
Call 811
Utility locating is free and usually required before digging. Marking buried lines prevents dangerous and costly hits.
Permits
Roofed structures, taller retaining walls, decks, gas and electrical work frequently need permits. Rules vary by city and county.
HOAs
Many associations require plans, materials and sometimes neighbor notice. Allow time for approval.
Setbacks and easements
Property lines, utility easements and drainage easements limit where you can build. Check your survey.
Let your contractor help
A good contractor prepares drawings, coordinates locates and explains what approvals your project needs.
Related services
Ready for a firm answer on your own yard? Try the Backyard Planner or call 615-431-3789 for a free design visit.
